About Anaconda Help Download Anaconda

r / packages / r-jointpm

Estimate risk caused by two extreme and dependent forcing variables using bivariate extreme value models as described in Zheng, Westra, and Sisson (2013) <doi:10.1016/j.jhydrol.2013.09.054>; Zheng, Westra and Leonard (2014) <doi:10.1002/2013WR014616>; Zheng, Leonard and Westra (2015) <doi:10.2166/hydro.2015.052>.

Label Latest Version
main 2.3.2

© 2025 Anaconda, Inc. All Rights Reserved. (v4.0.6) Legal | Privacy Policy